Transformation Tuesday 01/02/2018
Here is part II of this very large project we worked on for Transformation Tuesday:
The area was overgrown with weeds, taking over the flagstone patios and rock garden.
We started off with removing all the weeds and grass. Next, the current flagstones had to be pulled up, leveled, and reset.
Pathways were created with flagstone steps to connect three flagstone patios which were accented with gravel and bordered with moss rock. Flowerbeds were added along with shrubs and perennials.
We created a “dry riverbed” with gravel and used a weed barrier to help prevent weeds from coming back.
To finish off, an irrigation system was installed to help water and maintain the finished garden.